01

INSTALLATION DATES

The installation dates indicated in the contract are approximate and variable due to various factors over which we have no control (temperature, delays in other work, etc.). The date also indicates the start of the work

02

FACILITY

The installation is done in 2 steps. The first step is to dig the holes and install the posts in the cement.The customer is responsible for knowing where the terminals of the field areand at what distance from the line you wish to install. 25" each side of the line and you must make sure it is clear BEFORE we arrive. Once the posts are installed, they require a few days for the cement to harden. 

The 2 nd step is the final installation of your fence. Clôtures Stratégi-K undertakes to complete the 2 steps within a maximum of 7 working days

03

INSTALLATION METHOD

Your fence cannot follow the slope of the ground and at the same time be level on top. The customer mustCHOOSE BEFORE OUR ARRIVALthe way he wants us to put up the fence

  1. The top of the level fence without worrying about the bottom

  2. Following the slope of the ground as much as possible

  3. Install the fence in steps to follow the slope of the land (this type of installation will require more connection posts, and therefore, will be more expensive.

If you want to install slats, option 1 or 3 only applies